top of page
  • Facebook
  • Twitter
  • Instagram
Snow-Retention-Bar-Standing-Seam-.jpg

Snow Rail Fence

 Recommended installation is between  6-12" inches from the eave of the roof, up the ridge. 17-21 newton meters of torque is recommended. Different clamps for different panel profiles.

ColorGard Bar Color Strip

snow-guards-color-strip-mechanical-lock-metal-roof_edited.jpg

  Color strip applied to ColorGard bar to match standing seam roof. Proper protection, planning tools, equipment, and experience facilitate a safe install.

S-5 SnoClip Installation

Standing-Seam-Snow-Fence-Planning_edited.jpg

  SnoClips are installed between the standing seam clamps to break sliding snow impact to gutters. The 3" wide SnoClip sits between two Versaclips on a 16" wide panel.

S-5 S Clamp Installatiion

S5-Snow-Clamp-Torque-Calibration-Standing-Seam-SetScrews-.jpg

 Bullet nose set screws are driven into an indentation, on the other side of the s-5 clamp. The raised seam on each panel profile is indented and compressed into the clamp groove, without penetrating the metal. Mechanically seamed panels offer greater clamp grip strength, without adding aluminum parts in-between the ribs. Same clamps used to hold solar panels also. Choose your standing seam profile wisely.

© 2022 by Thee Denver Metal Roofing Company. All Rights Reserved.

bottom of page